PINE CANYON DAM AND RESERVOIR
LINCOLN COUNTY, NEVADA
PERTINENT DATA - June 2016
Project Purpose
Local Flood Protection
Completion Date
December 1957
Stream System
Clover Creek, Meadow Valley Wash, lower Muddy River Basin, Colorado River
Drainage Area
45 mi2
Significant Upstream Flood Control Facilities
None
DSAC Rating
4
Reservoir:
Elevation
NGVD 1929
+4.15 ft =
NAVD 1988
Streambed at dam
5,598.0
ft
5,602.2
Outlet Works Intake
5,604.0
ft
5,608.2
Spillway crest
5,675.0
ft
5,679.2
Revised PMF Spillway Surcharge Level2
5,688.5
ft
5,692.7
Top of dam
5,690.0
ft
5,694.2
Area1
Spillway crest
254
acres
Revised PMF Spillway Surcharge Level2
353
acres
Top of dam
367
acres
Capacity1, Gross
Spillway crest (includes sediment allowance)
7,840.0
af
Revised PMF Spillway Surcharge Level
11,439.2
af
Top of dam
11,060.0
af
Allowance for sediment (50-year)
1,400
af
Dam
Type:
Earthfill
Height above streambed
92
ft
Crest length
884
ft
Crest width
20
ft
Revised PMF Spillway Surcharge Freeboard2
1.5
ft
Spillway (rebuilt in 1994)
Type:
Excavated in left wall w/ Concrete Sill
Crest Length
330
ft
Crest Elevation
5,675.0
ft
5,679.2
Revised PMF Spillway Surcharge2
13.5
ft
Outlet Conduit
Type:
Ungated
Number and size
1 - 3.5 dia
ft
Intake Sill Elevation
5,604.0
ft
5,608.2
Length
479
ft
Maximum capacity at spillway crest
322
cfs
Dike
Type:
Earthfill
Top elevation
1 - 3.5 dia
ft
Height above saddle
5,604.0
ft
5,608.2
Top length
479
ft
Revised PMF Freeboard2
322
cfs
Reservoir Design Flood
Duration (inflow)
2.5
days
Maximum water surface elevation
5,674.6
ft
5,678.8
Total volume
7,300
af
Inflow, peak
10,500
cfs
Outflow, peak
321
cfs
Spillway Design Flood ➜
Duration (Inflow)
1
days
1.25
Total volume
5685.1 (5,689.3 NAVD)
ft
5,688.5 (5,692.7 NAVD)
Maximum water surface elevation
15,800
af
18,000
Inflow peak
38,000
cfs
68,100
Outflow peak
31,700
cfs
49,200
Historic Maximums
Date: 1/11/2005 (all)
Maximum water surface elevation
5,658.3
ft
5,662.5
Maximum storage (54% Full)
4,200
af
Maximum 1-hr inflow
2,415
cfs
Maximum 1-hr outflow
285
cfs
Reference: Design Memorandum No. 3, General Design for Pine Canyon Dam, July 1956
1. Based on Original October 1941 Survey [16 years prior to dam construction]
2. Interim Report on Hydrology and Hydraulic Review of Design Features of Existing Dams for Pine Canyon and Mathews Canyon Dams, July 1978